Jul. 27, 2021
Recently, the Baoding "Easy Line" oil, gas and hydrogen integrated energy service station undertaken by Enric (Langfang) Energy Equipment Integration Co., Ltd. (Langfang Integration), a member company of CIMC ENRIC, was successfully completed.Jul. 12, 2021
Recently, Nantong CIMC Energy Equipment Co., Ltd. (hereinafter referred to as "Nantong CIMC Energy"), a subsidiary of CIMC ENRIC, successfully delivered the first batch of 20-feet T75 cryogenic tank containers certified by Japanese KHK, which will be used in Japan Food-Grade liquid carbon dioxide required for the production of carbonated beveragesJun. 23, 2021
The whole lifting process took only 2 hours and 48 minutes, the lifting speed was stable and the progress was smooth. It took only 6 months from the start of the concrete pouring of the caps on December 21, 2020 to the completion of this air-lifting.